UNC Asheville Begins Site Work at 525 Broadway

Amy Jessee, UNC Asheville

UNC Asheville has begun site work at 525 Broadway in preparation for utilizing the property for overflow parking and material storage during construction projects that will begin in the spring of 2017. Campus Operations staff will mow brush, repair storm drains and install gravel for parking areas. These parking areas, accessible via Zillicoa St., will provide much-needed space during upcoming renovations to Highsmith Union and the construction of a new residence hall on campus.

The university will keep the public informed as these projects move forward.

For more information, contact UNC Asheville Campus Operations at 828.251.6564 or fac_mgmt@unca.edu.